55MW
GE Frame 6B Combined Cycle Complete Power Plant for Sale
Dual Fuel, 50Hz. Ansaldo Steam Turbine Generator
Power plant will remain in stand by operation up to end of October 2010 (available to the local grid only for peaking expected during summer 2010), date when the plant should go out of operation, be de-commissioned and available for sale.
Equipment |
Model |
Make |
Running hours |
Gas
Turbine |
Frame
6B Steam I (Ext) G.E. |
GE
Licensee |
110538 |
Steam
Turbine |
CDI
635 R |
Ansaldo
|
108906 |
GT
Generator |
45
Mva T190
- 240 |
Alstom |
110538 |
ST
Generator |
23
Mva GSCR - 1000 Z4 |
Ansaldo |
108906 |
Gas
Compressors |
2HM/1
- Nuovo Pignone |
Nuovo
Pignone |
110538 |
Heat
Recovery Steam Generator |
GVR |
(Ansaldo) |
110538 |
Step-up
transformer 11 - 11 - 220 KV |
3H6132
- TP |
ABB
|
duty since 1994 |
Transformer
6 - 0,4 KV x auxiliaries |
G30121/1
- TD1 |
|
duty since 1994 |
Transformer
6 - 0,4 KV x auxiliaries |
G30121/2
- TD2 |
|
duty since 1994 |
Transformer
22 - 04 KV x emergency feeding |
G30122/1
- TD3 |
|
duty since 1994 |
Transformer
11 - 6 KV x auxiliaries |
G30123/1
- TA1 |
|
duty since 1994 |
Transformer
11 - 6 KV x auxiliaries |
G30123/2
- TA2 |
|
duty since 1994 |
Typology |
Power
Plant Gross Output |
[MW] |
50,1 |
|
Arrangement |
|
combined cycle (1 TG +
1 TV) |
||
Main
fuel TG |
|
Natural gas |
||
Back
up fuel TG |
|
no |
||
Operation
mode |
|
Base load |
||
Black
start |
|
no |
||
By-pass
stack |
|
no |
||
Auxiliary
boiler |
|
yes (not for sale) |
||
Cogeneration
mode (steam flow): |
HP |
[t/h] |
8,5 |
|
IP |
[t/h] |
13 |
||
LP |
[t/h] |
6 |
||
Steam
pressure line: |
HP |
[bar] |
24 |
|
IP |
[bar] |
12 |
||
LP |
[bar] |
6 |
||
Efficiency
(thermal + electric) |
[%] |
60,0 |
||
Gross
Electric Efficiency (without cogeneration) |
[%] |
45,3 |
||
Weather |
Average,
min, max Temperature |
[°C] |
12; -8; 35 |
|
Average
Humidity |
[%] |
60,0 |
||
Gas Turbine |
Name |
|
TG1 |
|
Manufacturer |
|
G.E. |
||
Gas
turbine type |
|
MS 6541 B |
||
TG
Power - ISO conditions |
Preselected
load |
[MWe] |
- |
|
Base
load |
[MWe] |
39 |
||
1st
synchronizing |
|
Aug 1994 |
||
Operating
Hours fuel gas |
Fire
Hours: |
|
110538 at 01/05/2010 |
|
Equivalent
Operating Hours: |
|
not used |
||
Anti-icing
|
|
steam |
||
Filters |
Coalescer+prefilters+high
eff. |
yes |
||
Self
cleaning (pulse jet) |
no |
|||
Aspiration
system conditioner |
|
no |
||
Gas
compressor |
|
yes |
||
Gas
heating |
|
no |
||
NOx
reduction system |
|
steam injection |
||
TG
start device |
|
electric motor +
torque converter |
||
O2 |
[%] |
15 |
||
NOx
limit value |
[mg/Nm3] |
200 |
||
CO
limit value |
[mg/Nm3] |
100 |
||
Particulate
Matter limit value |
[mg/Nm3] |
- |
||
SOx
limit value |
[mg/Nm3] |
- |
||
HRSG |
Number
of unit |
|
1 |
|
Name |
|
GVR |
||
Manufacturer |
|
ANSALDO |
||
Post
firing |
|
no |
||
Fresh
air |
|
no |
||
Pressure
level and Temperature |
HP |
[bar
; °C] |
70 ;
500 |
|
IP |
[bar
; °C] |
- |
||
LP |
[bar
; °C] |
6 ;
285 |
||
RH |
|
no |
||
HP
Feedwater Pump |
Manufacturer |
KSB |
||
Q;
H; T
[m3/h
; m ; °C] |
69,7 ;
∆P max 75,5 ;
164 °C |
|||
Steam Turbine |
Name |
|
TV |
|
Manufacturer |
|
ANSALDO |
||
Serial
Number |
|
|
||
Power |
[MWe] |
15
(full condensing);
11 (cogenerative
condition) |
||
1st
synchronizing |
|
Aug 1994 |
||
Operating
Hours |
|
108906 at 011/05/2010 |
||
Condenser
fluid |
|
air |
||
Cooling system |
for
Steam Turbine |
Type |
|
air condenser |
Manufacturer |
|
|
||
Thermal
Power |
[MWt] |
44 |
||
for
Auxiliaries |
Type |
|
evaporative tower |
|
Manufacturer |
|
|
||
Thermal
Power |
[MWt] |
unspecified |
||
electrical |
TG
Generator |
|
ALSTOM |
|
Power
of TG Generator |
[kVA] |
46.000 |
||
Cooling
system of TG Generator |
|
air / water |
||
TV
Generator |
|
ANSALDO |
||
Power
of TV Generator |
[kVA] |
23.000 |
||
Cooling
system of TV Generator |
|
air / water |
||
Main
Transformer |
TG |
|
ABB |
|
TV |
|
|||
Type
of transformer |
TG |
|
75.000 kVA ONAN |
|
TV |
|
|||
Staff |
Total
staff of Power Plant |
|
15 |
|
Production
department |
|
11 |
||
Nb.
of staff per shift |
|
1 |
||
Maintenance
department |
|
3 |
Gas Turbine Combustion system is Dual Fuel (Natural Gas + Distillate Oil).
Starting System is based on Electric Motor.
Second major Inspection to the Gas Turbine was completed last year.
45 MVA Alstom Generator (for GT), model T190 – 240. Spare stator for this generator is available at stock.
Steam turbine accumulated 108.906 firing Hours.
ST cross section is reported below:
Both Compressors are powered by electrical motors.
PLANT IMAGES
Img 1.
Compressors room
Img 2. Steam Pipeline
Img 3. External
view of the plant
Img 4. External
view of the plant
Img 5. Gas
turbine air filter chamber
Img 6. Demi-water
tanks
Img 7. External
view of the transformers
Img 8. External
view of the transformers
Img 9. Turbine
control server
Img 10. Control
room
Img 11. Control
room