Portland General Electric coal fire plant in Boardman.

This plant is scheduled to be dismantled by the end of 2023 and all equipment is for sale immediately.

This plant is scheduled to be dismantled by the end of 2023 and equipment is for sale immediately.   This 550 MW coal-fueled electric generating power plant was commissioned in 1980 and had an estimated 20 years of remaining operation when shuttered on October 15, 2020. The facility will be dismantled by end of 2023. All of the plant equipment is to be sold and/or removed from the site.    The original project cost was $525 million.  Bechtel Power Corporation provided Engineering and Construction Management, and Swan Wooster, Inc. did the Coal Handling System.   The steam turbine generator was made by Westinghouse. The steam turbine is a three cylinder tandem compound quadruple flow consisting of combined high pressure/intermediate pressure element. High pressure turbine are 2400 psig at 1000 degree Fahrenheit and reheat steam entering the intermediate pressure turbine is 610 psig at 1000 degree Fahrenheit. Full load operation requires 3,854,940 lb/hr of main steam at the above conditions. Steam exhausts to the condenser at 2" of mercury absolute pressure.   The Westinghouse generator is hydrogen inner cooled; operating at 3600 rpm, 24,000 volts, 600,000 KVA and .95 power factor. The exciter is a 2220 kilowatt brushless design mounted at the end of the generator shaft. Generator hydrogen pressure maintained at 60 psig.   The condenser made by Southwestern Engineering Company is single pressure, two shell with once through dual pass cooling to the closed-cooling reservoir. Heat transfer area is 142,500 sq/ft per shell. Tube material: 90 copper/10 nickel alloy. Has vacuum pumps for air removal.
The Foster Wheeler Energy Corporation Boiler, is a balanced draft, natural circulation, single reheat parallel back-pass utilizing pulverized coal as the primary fuel and fuel oil for initial burner lighting. Thirty-two wall mounted burners are mounted in an opposed configuration.

Steam flow: 3,825,000 lbs/hr.
Steam pressure: 2900 psig.
Steam temperature: 1005 degrees F.
Reheat steam flow: 3,450,000 lb/hr.
Reheat steam pressure: 750 psig.
Reheat steam temperature 1005 degrees F.
Auxiliary steam flow at intermediate superheater outlet: 400,000 lb/hr.
Surface release rate: 63,588 btu/sq ft/hr.
Volumetric Heat release rate: 10,098 btu/cu ft/hr.
Other equipment includes the following:
Coal Pulverizers - Foster Wheeler Energy Corporation
Soot Blowers - Diamond Power Specialty Company
Air Preheaters - ABB Air Preheater Incorporated
All heaters equipped with electric backup drives.
Induced Draft Fans - Green Fan Company
Flue Gas Particulate Removal - Lodge-Cottrell Dresser
Chimney - Pullman Kellogg
Ash Removal - United Conveyor Corporation
Feedwater System
Condensate Pumps - Byron Jackson
Booster Pumps - Bryon Jackson
Main Feed Pumps - Byron Jackson
Startup Feed Pump - Byron Jackson
Feedwater Heaters - Struthers Wells Corporation
Chicago Heater Company
The number-four heater is the deaerator.

Water Treatment
Blace Filtronics, Incorporated
Raw water pretreatment accomplished using bag filters coated with diatomaceous earth.
Belco Pollution Control
High purity demineralized water is supplied by one of two makeup demineralizer system trains that utilize an activated carbon filter; cation and anion exchange vessels, and a mixed bed vessel. Capacity of one train: 350 gpm.
LA Water Treatment Systems
Dissolved and suspended solids are removed from the condensate by a full flow polishing system that utilizes mixed-bed cation-anion exchange resin vessels. Capacity: 7000 gpm.

Distributed Control System
Turbine/Generator - Westinghouse WDPF and DEH Mod 3
Boiler - Forney, Allen-Bradley PLC-5 and Westinghouse WDPF.
System Interface - Sootblowing, Allen-Bradley PLC-5
Stand Alone Controls
Ash Handling Systems - Allen-Bradley PLC-5
Water Treatment - Raw Water Pretreatment, Allen-Bradley SLC-500
Blace Filtronics, Incorporated
Raw water pretreatment accomplished using bag filters coated with diatomaceous earth.
Belco Pollution Control
High purity demineralized water is supplied by one of two makeup demineralizer system trains that utilize an activated carbon filter; cation and anion exchange vessels, and a mixed bed vessel. Capacity of one train: 350 gpm.
LA Water Treatment Systems
Dissolved and suspended solids are removed from the condensate by a full flow polishing system that utilizes mixed-bed cation-anion exchange resin vessels. Capacity: 7000 gpm.



Other significant equipment includes the following 269 rail cars.   

 