31MW SGT-600
Combined Cycle Plant for Sale
Natural Gas 50Hz.
(Plant being sold to be moved.)
Milt Fyre 503-351-9898 or milt@rmaglobal.com
31MW SGT-600 Gas Turbine and Steam Turbine in a package. Power is 23.5 MWe Gas Turbine + 7.5 MWe Steam Turbine. YOM 2000. Siemens GT10B ( SGT-600 ) Gas Turbine; Siemens T 6210 Steam Turbine ( Back Pressure) (60 T /H, 425 C, 61 BAR). Efficiency: 33% Simple Cycle; 44% Combined Cycle. Natural gas fuel. Can be upgrades for the other fuel types. In working condition. Total hours, Gas Turbine 96,990 hours. Steam Turbine 57,991 hours. 6 Months boroscope inspections. Last overhaul Gas Turbine: January 2015, Steam Turbine : October 2010. Hours following overhaul: Gas turbine: 2,855 hours. Steam Turbine: 9,073 hours. Starst 815. Consumption rate 325 sm3 / MWwhr. GBA 1120 LC Generator ( 26.25 kVA). AVK DIG 163 M/4 generator ( 11.000 kVA). BEST BRAND STEP-UP TRANSFORMER ( 30,000 kVA ). BEST BRAND STEP-UP TRANSFORMER ( 11,500 kVA ). BEST BRAND DEMAND TRANSFORMER ( 1.250 KVA ). SIEMENS BRAND, OG BREAKER, MEASURE AND EARTHING CELLS. The complete plant is being sold as equipment only and must be moved from the site.
Milt Fyre 503-351-9898 or milt@rmaglobal.com